Project Farmtrack

Galliford Try

18 weeks

£3.6m

A fast track pre-modular building for the MOD, comprising three floors of high security open plan office space, meeting rooms, video conferencing rooms, toilet cores and kitchens. Mechanically the building is serviced from three large air handling units and ductwork distribution systems, 24no VRF systems, boosted cold water and storage with local hot water generation and storage to each outlet all controlled and monitored via a central Building Management System.

Electrically the building consists of HV and LV electrical distribution, small power and lighting, fire alarm systems, disabled refuge and alarm as well as VAS.